 MAJOR UNITS
 
Major Unit
Crude & Vacuum Distillation
CDU Capacity
::
3.0 MMTPA
Designed By :: Engineers India Limited
Commissioned :: April’1999
VDU Capacity
::
1.32 MMTPA
Designed By :: Engineers India Limited
Commissioned :: April’1999
Delayed Coker Unit
Capacity
::
0.306 MMTPA
Designed By
::
Engineers India Limited
Commissioned
::
Sept’1999
Major Unit
Major Units
Hydrogen Unit
Capacity
::
38000 TPA
Licensor
::
HALDOR TOPSOE, Denmark
Commissioned
::
Feb’2000
Hydrocracker Unit
Capacity
::
1.1MMTPA
Licensor
::
CHEVRON,USA
Commissioned
::
June’2000
Major Unit
Major Unit
Sulfur Recovery Block
Capacity
::
4000 TPA
Designed By
::
Engineers India Limited
Commissioned
::
July’ 2000
Coke Calcination Unit
Capacity
::
0.104 MMTPA
Licensor
::
SVEDALA,USA
Commissioned
::
May 2004
Major Unit
Major Unit
Motor Spirit Plant
Capacity
::
225 TMTPA
Process licensor
::
M/s AXENS France
Consultant
::
Toyo Engineering (I) Ltd.
Commissioned
::
Naptha hydrotreating unit : June 2006

Catalytic Reforming unit : July 2006